HXYX 180 rubber crawler water well drilling rig | |||
The weight(T) | 4.5 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-254 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 180 | Rig lifting force(T) | 12 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.4 |
Equipped capacitor(kw) | 55 | Hoisting force of winch(T) | -- |
Using air pressure(MPA) | 1.7-2.5 | Swing torque(N.m) | 3200-4600 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 3950×1630×2250 |
Swing speed(rpm) | 45-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Quanchai engine | ||
HXY 180 steel crawler water well drilling rig | |||
The weight(T) | 5.2 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-254 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 180 | Rig lifting force(T) | 12 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.4 |
Equipped capacitor(kw) | 60 | Hoisting force of winch(T) | ---- |
Using air pressure(MPA) | 1.7-2.5 | Swing torque(N.m) | 3200-4600 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 4000×1630×2250 |
Swing speed(rpm) | 45-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Yuchai engine | ||
HXYL 200vehicle-mounted water well drilling rig | |||
The weight(T) | 4.7 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-254 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 200 | Rig lifting force(T) | 13 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 20-40 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Swing speed(rpm) | 45-65 |
Equipped capacitor(kw) | 65 | Hoisting force of winch(T) | ---- |
Using air pressure(MPA) | 1.7-2.5 | Swing torque(N.m) | 3400-4700 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 4350×1600×2450 |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Quanchai engine | ||
HXYX 200 rubber crawler water well drilling rig | |||
The weight(T) | 5 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-254 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 200 | Rig lifting force(T) | 13 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 30 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 60 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.6 |
Equipped capacitor(kw) | 65 | Hoisting force of winch(T) | 1.5 |
Using air pressure(MPA) | 1.7-2.5 | Swing torque(N.m) | 3400-4700 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 3950×1750×2250 |
Swing speed(rpm) | 45-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Quanchai engine | ||
HXY 260 crawler water well drilling rig | |||
The weight(T) | 6.5 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-305 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 260 | Rig lifting force(T) | 15 |
One-time advance length(m) | 3.3 | Rapid rise speed(m/min) | 24 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 28 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.73 |
Equipped capacitor(kw) | 70 | Hoisting force of winch(T) | 1.5 |
Using air pressure(MPA) | 1.7-3.0 | Swing torque(N.m) | 4000-5300 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 4000×1850×2300 |
Swing speed(rpm) | 45-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 10-35 | High leg stroke(m) | 1.4 |
The engine brand | Xichai engine | ||
HXY 280 crawler water well drilling rig | |||
The weight(T) | 7.6 | Drill pipe diameter(mm) | Φ76 Φ89 |
The hole diameter(mm) | 140-305 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 280 | Rig lifting force(T) | 17 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 25 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 30 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.7 |
Equipped capacitor(kw) | 75 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.0 | Swing torque(N.m) | 4500-6000 |
Air consumption(m³/min) | 17-31 | Dimension(mm) | 5900×1850×2360 |
Swing speed(rpm) | 40-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.4 |
The engine brand | Yuchai engine | ||
HXY 300 crawler water well drilling rig | |||
The weight(T) | 7.2 | Drill pipe diameter(mm) | Φ76 Φ89 Φ102 |
The hole diameter(mm) | 140-325 | Drill pipe length(m) | 1.5m 2.0m 3.0m |
Drilling depth(m) | 300 | Rig lifting force(T) | 18 |
One-time advance length(m) | 3.3/4.8 | Rapid rise speed(m/min) | 22 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.7 |
Equipped capacitor(kw) | 85 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.0 | Swing torque(N.m) | 5700-7500 |
Air consumption(m³/min) | 17-36 | Dimension(mm) | 4100×2000×2500 |
Swing speed(rpm) | 40-70 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.4 |
The engine brand | Yuchai engine | ||
HXY 350 crawler water well drilling rig | |||
The weight(T) | 8.6 | Drill pipe diameter(mm) | Φ89 Φ102 |
The hole diameter(mm) | 140-325 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 350 | Rig lifting force(T) | 22 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 18 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 33 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.7 |
Equipped capacitor(kw) | 92 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.4 | Swing torque(N.m) | 6200-8500 |
Air consumption(m³/min) | 17-36 | Dimension(mm) | 6000×2000×2550 |
Swing speed(rpm) | 66-135 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.4 |
The engine brand | Yuchai engine | ||
HXY 380 crawler water well drilling rig | |||
The weight(T) | 9.2 | Drill pipe diameter(mm) | Φ89 Φ102 |
The hole diameter(mm) | 140-325 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 380 | Rig lifting force(T) | 24 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.8 |
Equipped capacitor(kw) | 96 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.4 | Swing torque(N.m) | 6500-9000 |
Air consumption(m³/min) | 17-36 | Dimension(mm) | 5950×2100×2550 |
Swing speed(rpm) | 66-135 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.6 |
The engine brand | Yuchai engine ( National III ) | ||
HXY 450 crawler water well drilling rig | |||
The weight(T) | 9.4 | Drill pipe diameter(mm) | Φ89 Φ102 |
The hole diameter(mm) | 140-350 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 450 | Rig lifting force(T) | 25 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.8 |
Equipped capacitor(kw) | 103 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.5 | Swing torque(N.m) | 7000-9500 |
Air consumption(m³/min) | 17-36 | Dimension(mm) | 5950×2100×2600 |
Swing speed(rpm) | 50-135 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.6 |
The engine brand | Weichai engine ( National III ) | ||
HXY 500 crawler water well drilling rig | |||
The weight(T) | 11.5 | Drill pipe diameter(mm) | Φ102 Φ108 Φ114 |
The hole diameter(mm) | 140-350 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 500 | Rig lifting force(T) | 26 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.85 |
Equipped capacitor(kw) | 118 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.5 | Swing torque(N.m) | 7500-10000 |
Air consumption(m³/min) | 17-42 | Dimension(mm) | 6200×2200×2650 |
Swing speed(rpm) | 40-130 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.7 |
The engine brand | Yuchai engine | ||
HXY 580 crawler water well drilling rig | |||
The weight(T) | 12 | Drill pipe diameter(mm) | Φ102 Φ108 Φ114 |
The hole diameter(mm) | 140-350 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 580 | Rig lifting force(T) | 28 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.85 |
Equipped capacitor(kw) | 132 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.5 | Swing torque(N.m) | 8500-11000 |
Air consumption(m³/min) | 17-42 | Dimension(mm) | 6200×2200×2650 |
Swing speed(rpm) | 45-140 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.7 |
The engine brand | Cummins engine | ||
HXY 680 crawler water well drilling rig | |||
The weight(T) | 13 | Drill pipe diameter(mm) | Φ102 Φ108 Φ114 |
The hole diameter(mm) | 140-400 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 680 | Rig lifting force(T) | 30 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.95 |
Equipped capacitor(kw) | 153 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.5 | Swing torque(N.m) | 8850-13150 |
Air consumption(m³/min) | 17-42 | Dimension(mm) | 6300×2300×2650 |
Swing speed(rpm) | 45-140 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.7 |
The engine brand | Cummins engine | ||
HXY 800 crawler water well drilling rig | |||
The weight(T) | 13 | Drill pipe diameter(mm) | Φ102 Φ108 Φ114 Φ117 |
The hole diameter(mm) | 140-400 | Drill pipe length(m) | 1.5m 2.0m 3.0m 6.0m |
Drilling depth(m) | 800 | Rig lifting force(T) | 36 |
One-time advance length(m) | 6.6 | Rapid rise speed(m/min) | 20 |
Walking speed(km/h) | 2.5 | Fast feeding speed(m/min) | 40 |
Climbing angles(Max.) | 30 | Width of loading(m) | 2.95 |
Equipped capacitor(kw) | 194 | Hoisting force of winch(T) | 2 |
Using air pressure(MPA) | 1.7-3.5 | Swing torque(N.m) | 9000-14000 |
Air consumption(m³/min) | 17-42 | Dimension(mm) | 6300×2300×2650 |
Swing speed(rpm) | 45-140 | Equipped with hammer | Medium and high wind pressure series |
The penetration efficiency(m/h) | 15-35 | High leg stroke(m) | 1.7 |
The engine brand | Cummins engine |